Customer testimonial
Kemira Growhow SA/NV, Belgium - Fertiliser Industry
"Belsim quickly developed a VALI model of the complete plant and identified some incoherence in the results obtained with the [market leader] simulation tool, precisely at the boundaries between the different model parts. They also justified some remarks about a few overoptimistic assumptions made on the performance of the revamped plant, namely about the mode of insertion of a gas turbine and of a compressor...
... I would like to conclude by insisting on the very high skills and experience of Belsim engineers in process engineering and in ammonia plants in particular. With our own process engineers through this very high added value collaboration, we are very pleased to have worked jointly on this revamp project. Our decision has been clearly justified by the project output."
J. Rennotte, Managing Director
GKN GmbH, Germany - Nuclear Power Plant
"Beside an improved diagnosis of the behaviour of the components, the objective was to reduce the uncertainties of the measurements due to the systems related to safety and to get a closer knowledge regarding the precise disposal of performance...
...After the outage of 2002 the calibration on the feed water mass flow measurements has been supported by VALI III the first time. The more precise calibration possibility led to a reduction of the [previously] necessary conservatives by the mass flow determination. This results to an increase of thermal reactor power of the unit and therefore increased the electrical power outlet of 15MW in average."
Eberhard Grauf